STUDY, SUPPLY, INSTALLATION, AND COMMISSIONING OF EIGHT (08) BOILERS WITH A UNIT CAPACITY OF 200 T/H, INCLUDING THEIR AUXILIARIES, FOR THE GL1Z AND GL2Z COMPLEXES - RhinoTenders
STUDY, SUPPLY, INSTALLATION, AND COMMISSIONING OF EIGHT (08) BOILERS WITH A UNIT CAPACITY OF 200 T/H, INCLUDING THEIR AUXILIARIES, FOR THE GL1Z AND GL2Z COMPLEXES
[40100000] - Equipement et composants et systèmes de chauffage et ventilation et circulation d'air et climatisation - Heating and Ventilation and Air Circulation Systems and Equipment and Components (HVAC)[72151100] - Travaux plomberie, chauffage et climatisation - Plumbing and heating and air conditioning (HVAC)[72110000] - Travaux de bâtiment - Building construction services[72150000] - Travaux de bâtiment de second oeuvre - Specialized trade construction and maintenance services